Cycle Year 1 · Derived Live (America/New_York)

Q1 · Week 1 · Day 5

48-week annual cycle (4 x 12 weeks). Arc gaps mark Week 12 transition deloads.

Go to Today
Q1–Q3 Wk 6 Deload
Q4 Week 6 cutback is always mandatory.
Q1 · Jan – Mar

Build Muscle & Strength

3 Days Weights (Power -> Strength -> Hypertrophy) · 1 Day Indoor Sport · 2 Days Long Walks · 1 Rest Day

Block 1: Foundation
Weeks 1–4 · Technique, Baseline Loads & Volume Ramp

3x5 @ 75–80% 1RM (3-1-1-0) + 3 hypertrophy sets (10–12 reps, 2 RIR).

Block 2: Accumulation
Weeks 5–8 · Progressive Overload & Muscle Growth

4x4–5 @ 80–85% 1RM + 3–4 hypertrophy sets (8–12 reps, 1–2 RIR; optional Wk 6 deload).

Block 3: Peak Strength
Weeks 9–11 · Intensification, Cluster Sets & Power

4–5x3 @ 85–90% 1RM with 1+1+1 Cluster Sets (20s intra-rest) on Deadlift/Squat.

Optional Mid-Quarter Deload (Week 6)

Cut lifting volume by 50% (2 sets/exercise at 3–4 RIR) while keeping crisp movement speed.

  • · Grip strength drops noticeably
  • · Sleep quality declines for 3+ nights
  • · Joint aches persist across sessions
  • · Bar speed slows on standard working weights
Transition Deload (Week 12)

40–50% volume cut before Q2: 2x4 @ 65–70% 1RM on compound lifts, 2 sets @ 8–10 reps (3–4 RIR) on accessories.

Hard-Set Target: 10–16 hard sets per muscle group / week
Your Protein Target: 185g/day